George Bell

My feedback

  1. 701 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    George Bell supported this idea  · 
  2. 476 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    Jon Hardy responded

    The task ID is populated once the task is completed. Before this the task list items can be locked by the task engine for processing and a workflow accessing this task may fail. There has been therefore a strong reservation form our Engineering group to implement this capability even if technically feasible.

    If one wishes to delegate the task then the delegation should be used.

    Should you have other use cases for accessing the task list before the task is completed then please let us know what they are. There may be an alternative way of meeting this need that will not introduce the possibility of workflow failure.

    George Bell supported this idea  · 
  3. 204 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    Open for voting  ·  Euan Gamble responded

    Thanks for your suggestion. The Event content type is a bit more complex than a standard List content type due to the ‘All day event’, and the ‘Recurrence’ options.

    Both of these features include specific logic to show more options within the control itself and would only be used within this content type. Therefore, is a reasonable amount of effort for this content type.

    We may be able to include this feature into the product without ‘All day event’ and the ‘Recurrence’ options, but feel this would be an incomplete offering.

    Cheers,
    Euan

    An error occurred while saving the comment
    George Bell commented  · 

    using Nintex forms would like to be able to use All day Event in either Classic or Responsive forms

  4. 1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    An error occurred while saving the comment
    George Bell commented  · 

    Still desirable

Feedback and Knowledge Base