Ralph

My feedback

  1. 476 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    Jon Hardy responded

    The task ID is populated once the task is completed. Before this the task list items can be locked by the task engine for processing and a workflow accessing this task may fail. There has been therefore a strong reservation form our Engineering group to implement this capability even if technically feasible.

    If one wishes to delegate the task then the delegation should be used.

    Should you have other use cases for accessing the task list before the task is completed then please let us know what they are. There may be an alternative way of meeting this need that will not introduce the possibility of workflow failure.

    Ralph supported this idea  · 
  2. 209 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    13 comments  ·  2 - Nintex Forms for SharePoint » Designer  ·  Flag idea as inappropriate…  ·  Admin →
    Ralph supported this idea  · 
  3. 37 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    An error occurred while saving the comment
    Ralph commented  · 

    Makes much sense, in an SharePoint standard Form without Nintex it is possible.

    In Product version: 2.4.0.0 Release date: 29th October 2014 Nintex say They've fixed it, but actually it isn't
    ◦Ensured that Change Content Type control is visible when adding a new document (00067005)
    https://community.nintex.com/docs/DOC-1161-nintex-forms-2013-release-notes

    Ralph supported this idea  · 

Feedback and Knowledge Base